联系人:姜维彬
邮箱:
电话:17772422353
地址: 江苏南京市河滨西路1999号
| 品牌 |
DHL快递 |
公司名称 |
尼泊尔DHL |
| 业务范围 |
国外快递 |
重量分界点(Q) |
0.5 |
| 启运地 |
尼泊尔 |
目的地 |
全球各地 |
尼泊尔DHL-尼泊尔DHL快递-地址-电话-中外运敦豪-国际快递
Should you wish to contact specific hotline numbers, kindly select the type of inquiry below to view the hotline information.
General Shipping
Customer Service Hotline for: Pickup or Delivery Request, Check Shipment Status or Proof of Delivery
Hours Phone Email
08:00 AM to 07:00 PM 4481303 ktmreq@dhl.com
DHL Freight 是欧洲的公路货运供应商之一,计划在德国法兰克福市附近新建一个转运设施,以提高其整个欧洲网络的效率和质量。现代化的货运中心将建在 Erlensee 工业园区原空军基地的原址上。该项目由三座建筑组成:一个交叉码头、一个特殊化学品和一般生产材料的仓库和办公场所。这些主要是通过对前空军基地塔楼的翻新而创建的,该塔楼现在被列为该地点的历史古迹。新的 82,840 平方米建筑项目按照的建筑和环保标准进行设计,并符合德国邮政 DHL 集团的可持续发展路线图,该路线图要求所有新建建筑以可持续方式建造。草和植物已被纳入屋顶的设计,使建筑更具可持续性。跨码头码头屋顶具有安装容量高达 1 MWp(兆瓦峰值)的光伏板的潜力。参加奠基仪式的有 Main-Kinzig 地区管理局局长 Thorsten Stolz、Erlensee 市长 Stefan Erb、Ferdinand F?th、董事总经理 F?th Immobilien、Thomas Vogel、DHL Freight DACH 执行官、G?tz Hanningsmann、Erlensee 码头和经理区域现场经理Central DHL Freight 和 Gero Schiffelmann,管理委员会成员 DHL Freight Germany。草和植物已被纳入屋顶的设计,使建筑更具可持续性。跨码头码头屋顶具有安装容量高达 1 MWp(兆瓦峰值)的光伏板的潜力。参加奠基仪式的有 Main-Kinzig 地区管理局局长 Thorsten Stolz、Erlensee 市长 Stefan Erb、Ferdinand F?th、董事总经理 F?th Immobilien、Thomas Vogel、DHL Freight DACH 执行官、G?tz Hanningsmann、Erlensee 码头和经理区域现场经理Central DHL Freight 和 Gero Schiffelmann,管理委员会成员 DHL Freight Germany。草和植物已被纳入屋顶的设计,使建筑更具可持续性。跨码头码头屋顶具有安装容量高达 1 MWp(兆瓦峰值)的光伏板的潜力。参加奠基仪式的有 Main-Kinzig 地区管理局局长 Thorsten Stolz、Erlensee 市长 Stefan Erb、Ferdinand F?th、董事总经理 F?th Immobilien、Thomas Vogel、DHL Freight DACH 执行官、G?tz Hanningsmann、Erlensee 码头和经理区域现场经理Central DHL Freight 和 Gero Schiffelmann,管理委员会成员 DHL Freight Germany。
F?th Immobilien 正在建设中,位于 Main-Kinzig 区的新 Erlensee 场地位于 BAB 66 和 45 号高速公路交界处,交通便利,距离法兰克福约 25 公里。DHL Freight Maintal 码头和DHL Freight Euronet 的约260 名员工将搬迁到Erlensee 工作,预计中短期员工人数也将增长到300 人左右。此举将使 DHL Freight 进一步扩大其欧洲拼箱网络的容量,以满足对公路货运解决方案的高需求。
DHL Freight, one of the leading road freight providers in Europe, plans to increase efficiency and quality across its European network with a new transshipment facility near the German city of Frankfurt. The modern freight centre will be built on the site of the former military air base at the industrial park in Erlensee. The project comprises of three buildings: a cross-dock terminal, a warehouse for specialty chemicals and general production materials and office premises. These will largely be created through the refurbishment of the former air base tower, now listed as a historical monument on the site. The new 82,840 m2 construction project has been designed in accordance with the latest building and environmental protection standards, and in line with Deutsche Post DHL Group’s Sustainability Roadmap which requires all new builds to be built sustainably. Grass and plants have been incorporated into the design of the roof to make the building more sustainable. The cross-dock terminal roof harbors potential for the installation of photovoltaic panels with a capacity of up to 1 MWp (megawatt peak). The groundbreaking ceremony was attended by Thorsten Stolz, Head of Main-Kinzig District Authority, Stefan Erb, Mayor of Erlensee, Ferdinand F?th, Managing Director F?th Immobilien, Thomas Vogel, CEO DHL Freight DACH, G?tz Hanningsmann, Site Manager Erlensee terminal and Manager Area Central DHL Freight and Gero Schiffelmann, Member of the Management Board DHL Freight Germany.
Under construction by F?th Immobilien, the new Erlensee site situated in the Main-Kinzig district is conveniently located at the freeway junctions BAB 66 and 45, and lies about 25 km from Frankfurt. Around 260 employees from DHL Freight’s Maintal terminal and DHL Freight Euronet will be relocated to work in Erlensee, and the number of employees is also expected to grow to around 300 in the short to medium term. The move sees DHL Freight expanding its European groupage network capacity even further to meet the high demand for road freight transport solutions.
In addition to a 12,000 m2 cross-dock terminal, 3,800 m2 of office space and a 10,500 m2 warehouse for specialty chemicals are also being built on the site. To create office space required in Erlensee, the listed monument tower located on the former air base in the Fliegerhorst II industrial park will undergo extensive refurbishment and become part of the cargo centre. The warehouse for specialty chemical will comply with prevailing provisions under Germany’s Federal Immission Control Act (BImSchG) and Ordinance on Installations Requiring a Permit (4. BImSchV) and will also meet the strictest of safety standards.
Groundbreaking ceremony for the new build took place in mid-August, and completion of the logistics centre is scheduled for mid-2022. Construction is being overseen by F?th Immobilien, with Bockermann Fritze plan4building GmbH in charge of project management.