1.电动执行器安装环境要求The requirement of installation environment
●本产品既可在室内安装,也可在室内安装。
This product can be installed indoors, canalso install outdoors
●本产品属非防爆产品,请注意避开易燃、易爆环境
This product belongs to the non-anti-blastproducts, please pay atlention to avoiding the flammable, explosiveenvironment.
●在长期有雨水、原粮等飞溅物和阳光直射的环境,需要安装保护整台电动执行机构的防护
装备。详情联系王经理:153,8032,9557(wei 信同号)
In the environment where have the rainwaterraw materials such splash thing and that shoot direstly of sunshine for a longtime need o install the protective equipment for protecting whole Electricexecute instiution
●请预留接线、手动操作等维修用空间。
Please reserve wiring, manual operation,ctand maintain and use the space.
●周边环境温度-30℃-+60℃范围内。
Peripheral ambient temperature-30 C is-in+60 C range
2.工作介质温度的要求
Requirement for the job medium temperature
●与阀门配套使用时,工作介质温度传到执行机构上面,执行机构温度会升高。
While using with the valve together the jobmedium temperature is passed to the executive body, the temperature ofexecutive body will rise 详情联系王经理:153,8032,9557(wei 信同号)
工作介质是高温时,与阀门连接的支架起减少热传导的作用。
Work in the job medium is at a hightemperature, the support connected with the valve plays a role in reducing the heat-conduction
●工作介质温度60℃以下时请选用标准支架。
Please select the standard support for usuWhen the job medium temperature is under 60 C
●工作介质温度60℃以上时请选用高温支架。
More than 60 t of job medium temperaturelease select the high-temperature support fir use
3.现场电线管、电缆线安装要求
The requirement of the electric wire tube.cable install on-the-spot
用电线管时,请按图图(3)安装详情联系王经理:153,8032,9557(wei 信同号)
When being in charge of electric wire.please install according to the picture(3).
1电线管外径是Φ9-ゆ11的电缆。
A cable that the electric wire s extemaldiameter in o9-011
2要充分采取防水对策
Fully adopt the waterproof countermeasure
3执行机构应高于电线管,使电线管内水珠不至流进机构以确保其安全。
The executive body should be higher thanthe electric wire to manage, he drops of water are unlikely to flow into tohold
the organization in order to guarantee itssecurity in making the electric wire in change of.